One of the photos on Stark Parks' Quail Hollow Park page shows cross-country ski tracks cut through fresh snow behind the Stewart Manor House. The 40-room house sits at the center of more than 700 acres of meadow, marsh and pine and hardwood forest, and in winter the ski tracks pass right behind it.
That house now sets the park's deadline. Stark Parks is raising nearly $3 million through a campaign called One Hundred Years at the Hollow, and the goal is to finish the work by 2029, the Manor House's 100th anniversary. The first building on the list is still in design, though, so the park works the way it always has this winter. If you live in Hartville or Uniontown, the next few months are your last ordinary winters before the renovation starts. The first changes will be at the places you already pass on a cold-weather walk.
Why 2029 Is the Date
According to the Quail Hollow Volunteer Association's history of the park, the story starts in 1901, when Harry Bartlett Stewart started buying the old Brumbaugh homestead and the land around it, and over time the estate grew to 720 acres. Additions finished in 1929 turned the house into the 40-room manor you see today, with a servants' cottage and a carriage house on the grounds.
The Stewart family later offered the land and buildings to the state of Ohio for half their appraised value. On May 15, 1975, Quail Hollow became a state park under the Ohio Department of Natural Resources. The volunteer association was founded in 1982, and Stark Parks took over management in 2016. The campaign counts its century from the house. The 1929 additions finished the estate, and the 1929 carriage house is the first building the campaign will rebuild.
The Carriage House Comes First
The campaign's project page lists the work in roughly this order:
- Carriage House. It will become an accessible space for park events, programs and public rentals. The plan adds flushable restrooms you can reach from outside and a new accessible parking area, and it includes HVAC upgrades and removal of underground storage tanks.
- Manor House. The house gets a new HVAC system, a fire alarm system, better access at the rear entry and lighting upgrades.
- Boardwalks. The deteriorating boardwalks will be replaced.
- Picnic shelter. A new outdoor shelter will be added.
One item is already finished. The Levitt House has been removed, and its site has been restored to natural conditions.
The Carriage House is also the biggest single piece. Stark Parks' capital project list, last updated Sept. 29, 2026 and included in the October 2026 board packet, puts the renovation at an estimated $805,000. Of that, $781,500 is already lined up: $171,500 in state capital funds and $610,000 from Stark Community Foundation. That means the project is close to fully funded. On the same list, the project's status reads "Design" and its planning year reads 2027.
Across the whole campaign, Stark Parks reports $1.5 million in pledges and fundraising, nearly half the goal. At its August 2026 meeting, the park board formally accepted $410,000 from Stark Community Foundation for Quail Hollow improvements. Funders named on the campaign page include the Timken Foundation, the Hoover Foundation, the Lemmon Foundation, the Deuble Foundation and the Paul and Carol David Foundation. The money also comes from Community Development Block Grant funds, state demolition funds for the Levitt House, and several named funds held at Stark Community Foundation.
When the campaign launched in November 2025, Stark Parks Executive Director Dan Moeglin told YourOhioNews what the agency was aiming for:
"restore and position Quail Hollow Park for the next 100 years as a regional public asset."
What That Schedule Means for a Visit This Winter
Since the Carriage House is listed with a 2027 planning year, it's easy to plan a visit this season. Stark Parks lists 7.7 miles of hiking trail, 3.3 miles of mountain bike trail and 4.4 miles of horseback riding trail at Quail Hollow.
Deer archery season is underway. Stark Parks' park and trail alerts say bow hunters are in parts of Quail Hollow, the trails stay open during hunting, and visitors should wear bright clothing whether they're hiking, mountain biking or riding. The same alerts page gives the archery season at Walborn Reservoir as Sept. 26, 2026 through Feb. 7, 2027. That overlaps the January and February weekends when the ski shop usually opens. Keep a blaze-colored hat or jacket by the door through the end of ski season, not just through the fall.
Some of the park's quieter features stay open in the cold. A Wind Phone booth sits off the Nature For All Trail near the P4 sign intersection. The phone isn't connected, and it's there for people who want a private, quiet place to call a loved one they've lost. The 2-acre pond, to the left where the main park driveway splits, is open for fishing, and the Quail Hollow Park page notes that a valid Ohio fishing license is required.
The boardwalks you cross this winter are the ones the campaign plans to replace. The Carriage House you pass near the Manor House is the building that will become the park's accessible event space, with restrooms you can reach from outside.
When the Snow Reaches Four Inches
Of Stark Parks' locations, only Quail Hollow rents cross-country skis and snowshoes. According to the Stark Parks winter page, the rental rules are:
- When: Usually weekends in January and February, and only with at least 4 inches of snow on the ground.
- How: First come, first served, with no registration.
- Skis: $10 per person for two hours. Equipment fits anyone 4 feet tall or taller, in boot sizes from Youth 11.5 to Men's 14.
- Snowshoes: $10 for adults and $5 for children under 12, for two hours. The snowshoes fit shoe sizes from Women's 7 to Men's 14, and there's one pair for kids.
- Conditions: The trails aren't groomed, and the park doesn't make snow.
Since everything depends on the weather, Stark Parks sends Winter Activity Alerts by email to say when the ski shop will open. You can sign up with your name and email on the winter page. The winter page also lists Quail Hollow as one of three Stark Parks sledding spots, along with Petros Lake Park and Tam O'Shanter Park.
The Manor House holiday events in December are covered in our Hartville holiday calendar. After the holidays, the snow-day rental routine is the main reason to head to the Hollow.
The Trail That Will Eventually Lead Here
The centennial work isn't the only Quail Hollow project in Stark Parks' plans. The Quail Hollow Connector Trail is a planned 1.5-mile walking and biking path between Lake Township Community Park and Hartville Memorial Park. Along the way it would pass the Stark Parks wetland property, Lake Middle/High School and GentleBrook. In Stark Parks' May 2026 capital schedule, that first segment is marked "Planning 2026-2027," with an estimated cost of $812,623. In May, the Lake Local board approved a lease and maintenance agreement for the trail.
The segment that would actually reach the park comes later. The county's 2026-2035 parks plan lists a Phase 2 route from Quail Hollow Park to Lake Elementary School and estimates it at $750,000 in 2036. So for this winter and the next several, you'll still get to the Hollow by car, and the ski shop opens once the snow reaches four inches.
The Bartlebaugh Team lives and works in this corner of Stark County. We'll keep following the Quail Hollow work as the Carriage House moves from design to construction. If you have questions about life near the park in Hartville or Uniontown, or about anything else in the area, Nancy Bartlebaugh and the team are glad to help. Let's Connect.